January 20, 2024
From June 23 to 25, 2023, Brandon Lan, general manager of Xi'an Brictec Engineering Co., Ltd
arrived at the site of the 750TPD brick factory project in Iraq. This project is located in Sulaimani Province, Iraq, near the Chamchamal area, Chamchamal and Sulaimani cities near the highway. The project of Company's 750 tons per day brick factory. Main product specifications of this project: 400*200*200, auxiliary products: 200*400*400, products that can be produced by existing factory production equipment, auxiliary products: 200x200mm (hollow bricks) products that can be produced by existing factory production equipment.
Xi'an brictec#Single-layer Drying#Prefabricated Wall Panel#Brick Factory Process Design#Natural Gas Combustion System
Xi'an Brictec Engineering Co., Ltd Please indicate the source for reprinting